Compute before the building is ready.
Power, permits and interconnects can take far longer than an AI roadmap allows. CAISSON™ modules are designed to bring GPU compute, power distribution, cooling and networking to the site, so capacity can start where the power is, then move or scale as the project changes.
Speed to compute, without the permanent build.
The same CAISSON platform built for expeditionary defense use, applied to commercial sites where time, power or location rule out a traditional data hall.
Speed to compute
Designed to arrive integrated and tested, so the critical path is site prep and power, not a building.
Relocatable
Container- and shelter-class modules are designed to move by truck, rail or ship when the site or the project changes.
Scales by module
Start with one module and add more as demand, power or budget allows, on a common architecture across C1–C40.
Integrated power, cooling & networking
Power distribution, thermal management and networking designed into each module. Capacity figures are TBD.
Where commercial rapid deploy fits.
Example applications CAISSON is being designed for.
AI capacity before the grid is ready
Bridge the months or years between an AI capacity need and a finished building or utility interconnect.
Natural gas, flare gas & solar sites
Bring compute to underused power at the wellhead, flare site or solar array, rather than moving power to compute.
Disaster response & FEMA support
Surge compute and communications support for emergency operations when local infrastructure is damaged or overloaded.
Edge inference near the network
Modular GPU capacity at towers, hubs and aggregation sites for low-latency AI services.
Mining, energy and oil & gas
On-site processing for sensor, imaging and operational data at remote field sites with limited backhaul.
Events & bridge capacity
Time-bound capacity for events, migrations, pilots and projects waiting on permanent infrastructure.

Pick the class. Add modules as you grow.
GPU counts, power draw, cooling capacity, weights and dimensions are TBD — pending engineering. Site power, permitting and interconnection remain the customer's or site owner's responsibility unless otherwise agreed.